Allure Flooring Install On Concrete

By Admin | November 4, 2023

Allure Flooring Installation on Concrete: A Comprehensive Guide

Allure flooring, renowned for its durability and ease of installation, is an excellent choice for both residential and commercial settings. When installed on concrete, it offers a sturdy and attractive flooring solution. Here's a comprehensive guide to ensure a successful Allure flooring installation on concrete:

1. Surface Preparation

Begin by thoroughly cleaning the concrete surface to remove any dirt, dust, or debris. Concrete must be smooth, level, and free of moisture. Use a concrete grinder or leveler to correct any imperfections and ensure a flat surface for installation.

2. Moisture Barrier Installation

Since concrete can emit moisture, a vapor barrier is essential to prevent damage to the flooring. Use a polyethylene sheet, minimum 6 mil thickness, and lay it directly over the concrete surface, overlapping seams by 6 inches and taping them securely. Extend the barrier up the walls by 4 inches.

3. Underlayment

Allure flooring typically requires an underlayment to enhance sound insulation and provide a cushioned feel underfoot. Choose an underlayment specifically designed for concrete subfloors, such as a foam or rubber underlayment. Secure it to the concrete using double-sided tape or adhesive.

4. Plank Installation

Start installing the Allure planks from a corner of the room. Remove the protective backing from the first plank and firmly press it into place on the underlayment. Interlock the subsequent planks using the tongue-and-groove system. Stagger the joints for stability.

Use a tapping block and hammer to gently tap the planks into place, ensuring they are firmly connected. Trim excess planks at the edges to fit the room dimensions.

5. Transitions and Baseboards

For seamless transitions between different flooring types, use transition strips or moldings. Secure them using appropriate fasteners. Install baseboards around the perimeter of the room to conceal the gap between the flooring and the wall.

6. Maintenance

Allure flooring is relatively low-maintenance. Sweep or vacuum regularly to remove dust and dirt. Use a damp mop with a non-abrasive cleaner for deeper cleaning. Avoid using harsh chemicals or abrasive cleaners that may damage the flooring.

Tips for Success

* Allow the flooring to acclimate to the room temperature for 48 hours before installation. * Use a sharp utility knife or flooring cutter for precise cutting. * Wear gloves and safety glasses during installation. * Leave a small expansion gap around the perimeter of the room to allow for contraction and expansion of the flooring. * Follow the manufacturer's instructions carefully for the specific product you are using.


A Concrete Floor For Vinyl Flooring

How To Prepare A Concrete Floor For Vinyl Flooring Parrys

Install Vinyl Plank Flooring On Concrete

Easy Ways To Install Vinyl Plank Flooring On Concrete

Tips For Installing Vinyl Plank Over

Tips For Installing Vinyl Plank Over Concrete Floors Lemon Thistle

How To Install Vinyl Plank Flooring On

How To Install Vinyl Plank Flooring On Concrete Step By Guide

Install Vinyl Flooring On Concrete

How To Install Vinyl Flooring On Concrete Floor Ers

How To Install Vinyl Or Laminate Floors

How To Install Vinyl Or Laminate Floors In A Basement Over Concrete Slab

Laminate Flooring On Concrete Basement

Laminate Flooring On Concrete Basement Floors Expert Installation Guide Csg Renovation

Concrete Subfloor Preparation For The

Concrete Subfloor Preparation For The Vinyl Floor Installation How To Diy Mryoucandoityourself

Installing Laminate Flooring Over

Installing Laminate Flooring Over Concrete The Ultimate Guide Aa Floors

Install Vinyl Plank Flooring On Concrete

Easy Ways To Install Vinyl Plank Flooring On Concrete


Leave a Reply

Your email address will not be published. Required fields are marked *